Aqualogic, Leaders in Laundry

Brands we supply

Milnor commercial laundry equipment in Australia

Industrial washers and continuous batch tunnel systems

Milnor logo

Why we supply Milnor

Milnor is built for central laundries and heavy industrial work, from large open pocket washer extractors through to continuous batch washing tunnels processing thousands of kilograms a shift.

Milnor manuals & documents
  • Open pocket washer extractors to 330kg
  • CBW continuous batch tunnel systems
  • Industrial dryers matched to tunnel output
  • Engineered, installed and maintained by Aqualogic

Enquire now

Ask about Milnor

Your enquiry is tagged to this range, so the specialist who calls you already knows which machines you're looking at.

Thanks for reaching out. A real person from our team will read this and get back to you. We only use your details to help with your enquiry, as set out in our Privacy Policy.

The range

Milnor machines we supply and install

Milnor open pocket washers
Milnor MWF Series
Milnor CBW tunnel systems
Milnor industrial dryers

Why we sell it

What Milnor does better

We only carry ranges we are willing to put our own technicians behind.

Open pocket washer extractors up to 330kg
CBW continuous batch tunnel systems for central laundries
Industrial dryers sized to tunnel throughput
Engineered as a whole plant, not a shopping list of machines
Supported by Aqualogic project management and commissioning

Where Milnor fits best

  • Central and commercial laundries processing tonnes a shift
  • Hospital and healthcare linen plants
  • Hotel linen operations and linen hire
  • Food and beverage and workwear processing

Supplied and supported by one team

Every Milnor machine we supply is installed and commissioned by our own technicians, backed by parts held in Australia and covered by a preventative maintenance program if you want one. One number for equipment and service, so there is nobody to point a finger at when something stops.

Questions

Buying Milnor, answered

When does a tunnel washer make sense over open pocket machines?

Generally once you are consistently processing over about 500kg an hour of similar classifications. We will model both against your real volume and labour before recommending either.

Can you project manage a full plant install?

Yes. We handle layout, services coordination, install, commissioning and operator training, then maintain the plant afterwards.

Not sure it is the right fit?

A straight answer, not a sales pitch

Girbau TBS tunnel systems are the other option we quote at this scale. We will model both against your linen volume.

Milnor is a trademark of its owner. Aqualogic supplies, installs and services this range in Australia.

Not the brand you were after? See every brand we service.